click for home page









Expressions of Interest



Contact Details

Simon Dring
ICN - NT
Ph: (08) 8922 9433
Fax: (08) 8922 9430
Mobile: 0427 873 869
Email: [click to email]



Kitan Development Project - Sub Sea Equipment and Flowlines Installation

Project Owner: Technip
Project Value: -
Project Status: Open
Location: NT, Australia

Associated Projects:
Kitan Development Project
   - Kitan Development Project - Sub Sea Equipment and Flowlines Installation
   - Kitan Development Project - Drilling Program
   - Kitan Development Project - FPSO Supply, Operations and Maintenance
   - Kitan Development Project - Sub Sea Equipment Supply

Project Management & Engineering
• Project management
• Engineering of the risers and flowlines system
• Engineering of the risers and flowlines system installation and pre-commissioning
• Engineering of the Umbilical system and Subsea distribution system installation and pre- commissioning

Procurement and Fabrication
• Procurement and fabrication of the flexible pipe (23 km in total)
• Procurement and fabrication of the risers and flowlines system ancillary equipment
• Procurement and fabrication of installation aids required during operation

Transportation
• Transportation to Site of all the project equipment including Company provided items (Umbilical and Subsea distribution system)

Installation and Pre Comissioning
• Offshore installation of the risers and flowlines system - Tie-in to subsea wells, pipe lay and risers hook up to the FPSO

• Offshore installation of the umbilical and subsea distribution system - Tie-in to subsea wells, umbilical lay, subsea distribution unit installation, umbilical riser hook up to the FPSO

• Pre-commissioning (from the FPSO) of the risers and flowlines system

• Pre-commissioning (from the FPSO) of the umbilical and subsea distribution system

Definitions:

Tier 1 - A functional unit or complete package i.e able to produce/supply ALL of the requirements.

Tier 2 - A component or part of the package i.e able to produce/supply part or some of the requirements.

 

Technip Points of Contact:

Kitan Project manager - Christphe Malaurie  

Tel: 61 8 9463 2711

E-mail: cmalaurie@technip.com

  

Kitan Project Controls Manager - Mark Connelly

Tel: 61 8 9463 2618

E-mail: mconnelly@technip.com



click to expand/contract Work Packages

Currently Listing 7 Work Packages:
Tier 1: Complete package or service for this work package required. Tier 2: Partial package or service for this work package allowed.
  Work Package
Status

Applications Open

Tier 1 Closes

Tier 2 Closes

PDF
INSULATION COVERS Open 1 Sep 2010 30 Sep 2010 1 Jan 2011 Download Documentation
ANODES Open 1 Sep 2010 30 Sep 2010 1 Jan 2011 Download Documentation
STEEL BEND RESTRICTORS Open 1 Sep 2010 30 Sep 2010 1 Jan 2011 Download Documentation
RISER HANG-OFF COLLARS Open 1 Sep 2010 30 Sep 2010 1 Jan 2011 Download Documentation
INSTALLATION AIDS Open 1 Sep 2010 30 Sep 2010 1 Jan 2011 Download Documentation
RIGGING Open 1 Sep 2010 30 Sep 2010 1 Jan 2011 Download Documentation
Kitan Development Project - Project management - Any Opportunities Open 1 Jul 2010 5 Jul 2011 n/a

Powered by ICNL | Copyright © 2010 ICNL