click for home page









Expressions of Interest



Contact Details

Simon Dring
ICN - NT
Ph: (08) 8922 9433
Fax: (08) 8922 9430
Mobile: 0427 873 869
Email: [click to email]



Kitan Development Project

Project Owner: ENI Australia (WA)
Project Value: -
Project Status: Open
Location: NT, Australia

Associated Projects:
Kitan Development Project
   - Kitan Development Project - Sub Sea Equipment and Flowlines Installation
   - Kitan Development Project - Drilling Program
   - Kitan Development Project - FPSO Supply, Operations and Maintenance
   - Kitan Development Project - Sub Sea Equipment Supply

Eni has a 40% interest in and is Operator of the JPDA06-105 PSC area, containing the Kitan oil field. In 2009 the Field Development Plan was submitted to the Timor-Leste National Petroleum Authority with a view to commencing the project in first quarter 2010, once approval has been received.

The development concept involves three initial sub sea production wells tied back to a Floating Production, Storage and Offloading Vessel (FPSO), located near the field. At end 2009, all major contracts for the project were either awarded or well advanced.

In a further strengthening of Eni's position in the Timor Sea, the development of Kitan is another step in Eni's longer term vision of discovering and producing hydrocarbons in what is thought to be an area with strong future potential.

Definitions:

Tier 1 - A functional unit or complete package i.e able to produce/supply ALL of the requirements.

Tier 2 - A component or part of the package i.e able to produce/supply part or some of the requirements.



click to expand/contract Work Packages

Currently Listing 2 Work Packages:
Tier 1: Complete package or service for this work package required. Tier 2: Partial package or service for this work package allowed.
  Work Package
Status

Applications Open

Tier 1 Closes

Tier 2 Closes

PDF
SLICKLINE EQUIPMENT & SERVICES SUPPLY Open 3 Aug 2010 30 Sep 2010 n/a Download Documentation
Kitan Development Project - General Opportunities Open 1 Jul 2010 5 Jul 2011 n/a

Powered by ICNL | Copyright © 2010 ICNL